TIANJIN MODERN ENGINEERING EQUIPMENT MANUFACTURING CO., LTD

MEC is conveniently located within the Tanggu Marine High-Tech Zone in Tianjin, China. The facility is about 8km from Tianjin Xinggang Port, 25km from Tianjin Binhai Airport, and 150km from Beijing International Airport.

 

 

 

 

MEC has manufactured large industrial sized parts (largest piece: 33m X 9m X 9m) and successfully transported these parts via Tianjin Xinggang Port to many foreign countries.

MEC has built 2 plants on its 35,000 square meters of land. One plant covers a 6,000 square meter area, including two 100m x 30m spans. Each span has a 32/5 ton overhead crane. The second plant covers a 3,000 square meter area, including two 75m x 20m spans. Each span has a 20/5 ton overhead crane. MEC has an additional 7,500 square meter open-air work area next to its plants.

MEC has a variety of special equipment for steel fabrication and machining. For example: plate-bending machines, vertical lathes, and plate-shearing machines, etc.
Please refer to MEC’s equipment list for details.

 

MEC has primarily done business in the following three fields:

  • Manufacturing steel structures for environmental equipment.


  • Manufacturing and assembling electrical furnace converters.


  • Manufacturing and assembling port crane equipment
  •  

     

    Manufacturing and Erecting Port Cranes


    Cooperating with its manufacturing partners, such as KONE, KRUUP, MAN, MHI, KALMAR, FTM, and IMPSA, MEC has manufactured more than 60 units of port gantry cranes, multipurpose cranes, ship-to-shore container cranes, ship-loaders, ship-unloaders, floating cranes, rubber tire container cranes, and bulk handling systems, etc.

    In this partnership, MEC’s manufacturing partners provide the design, drawing, electrical systems, mechanical equipments, and engineering supervision for the product. MEC provides works such as relative steel material procuring, steel structure fabrication, parts installation and assembly, final erection, commissioning, loading, and ocean transportation.

     

    Manufacturing Metallurgy Equipment


    MEC has fabricated and manufactured about 50 sets of steel structures for still mill equipment. Most of these projects were in cooperation with TTI Group, Italy.
    Please refer to MEC’s Metallurgy Equipment Project List for details.

     

     

     

    Steel Structure Fabrication and Installation


    MEC has fabricated more 5,000 tons of high building architecture steel structures, bridge steel structures, and port crane repairing steel structures, etc.